Interconnection Studies

We are working with Southwest Power Pool to assess any potential impact that the Plains & Eastern Clean Line will have on the electric grid in the region including the identification of any mitigation to these impacts if required. Please see below to download minutes from meetings that we have had with affected parties and completed studies.

Addendum 1 to Plains & Eastern Clean Line Dynamic Stability Report with Appendices – October 2012

Plains & Eastern Clean Line Stability Analysis Review – September 2012

Plains & Eastern Clean Line Dynamic Stability Report with Appendices – August 2012

Steady State Analysis for SPP Criteria 3.5 Studies - Plains & Eastern Clean Line – August 2012

SPP Criteria 3.5 Affected Parties Meeting – May 8, 2012

SPP Criteria 3.5 Affected Parties Meeting – February 22, 2012

SPP Criteria 3.5 Affected Parties Meeting – November 1, 2011


SPP Criteria 3.5 Affected Parties Meeting – June 8, 2011

We are working with the Tennessee Valley Authority (TVA), Memphis Light, Gas, and Water (MLGW), and the Midcontinent Independent System Operator (MISO) to assess any potential impact that the Plains & Eastern Clean Line will have on the electric grid in the region including the identification of any mitigation to these impacts if required.  Below please find a link to the most recent MISO feasibility study report, MLGW’s Affected System Impact Study report, and TVA’s Interconnection System Impact Study report.  Additional studies will be posted as they become available.

MISO Interconnection Feasibility Study Report – February 10, 2014

MLGW System Impact Study – March 2014

TVA Interconnection System Impact Study – March 19, 2014

MISO Affected System Impact Study Report – May 2015
 
MISO Definitive Planning Phase (DPP) Impact Study Reports – September 2016